WATER, SANITATION AND WASTE

Putting our multidisciplinary and integrated vision at the service of a greater balance between humanity and the planet.

The specialists of the Water, Sanitation and Waste Business Unit work on designing sustainable and optimized infrastructure to ensure people's access to clean water and healthy waste and wastewater management.

 

The Business unit provides diverse interventions, covering planning, study and design of water supply for urban, industrial, agricultural and energy uses, river regulation, sanitation, wastewater and sewage treatment, as well as waste management and disposal, in order to ensure the protection of the environment, public health and natural resources.

 

We offer experience, knowledge and multidisciplinary services, provided by a highly qualified, motivated and committed team, with a solid and transversal background.

Reference Projects

MULENVOS LANDFILL - RECOVERY OF DEGRADED AREAS AND INCINERATION PLANT

The Mulenvos landfill is considered the second largest in Africa, with an area of 270 hectares and seven layers seven metre high.
View More +

STORMWATER PLAN FOR THE MUNICIPALITY OF JABOATÃO DOS GUARARAPES

Channel and regulation works in Cajueiro Seco and Nova Divinéia.
View More +

EXPANSION OF THE WATER SUPPLY SYSTEM OF MATRIZ DA LUZ DISTRICT IN THE MUNICIPALITY OF SÃO LOURENÇO DA MATA

The assignment corresponded to a structural action projected to absorb the demographic growth of the city for the next 20 years, allowing the increase of the total flow to 500 litres per second.
View More +

MACRO DRAINAGE AND STABILISATION OF MORRO DO TCHIZO PROJECT – PHASE 1, IN THE PROVINCE OF CABINDA

Degraded area treatment (ravine), with a mixture of earthwork solutions consisting of slopes and benches, surface water treatment and drainage.
View More +

CONSTRUCTION OF NEW WATER SUPPLY SYSTEMS IN THE MUNICIPALITIES OF ECUNHA, CHITEMBO, CACULA, JAMBA, CANGANDALA AND QUELA

Detailed design developed in the scope of the Government project, implemented by the Direcção Nacional de Águas (DNA) "Water for all" programme, with a view to speed up the supply of drinking water to the populations of the town' s centres.
View More +

CONTROL OF 77 RAVINES IN THE PROVINCES OF CUANDO CUBANGO, HUAMBO, UÍGE, MALANJE, BIÉ, LUNDA SUL, LUNDA NORTE AND MOXICO

Detailed Design for the recovery of 77 ravines in 10 provinces of Angola. The disorderly occupation of spaces together with the geological characteristics of Angolan soils result in serious ravine processes, which often risk buildings and infrastructure, as roads and railways.
View More +
Project

MULENVOS LANDFILL - RECOVERY OF DEGRADED AREAS AND INCINERATION PLANT

Waste
2007
Luanda, Angola
Elisal

The Mulenvos landfill is considered the second largest in Africa, with an area of 270 hectares and seven layers seven metre high.

Services:

Environmental Impact Study and Design of an incineration unit with 14 tons capacity.

Project

STORMWATER PLAN FOR THE MUNICIPALITY OF JABOATÃO DOS GUARARAPES

Water
2015
Pernambuco, Brasil
Prefeitura de Jaboatão dos Guararapes

Channel and regulation works in Cajueiro Seco and Nova Divinéia.

Services:

Distribution plan for the waterways that flow into Olho d’Água lagoon.

Project

EXPANSION OF THE WATER SUPPLY SYSTEM OF MATRIZ DA LUZ DISTRICT IN THE MUNICIPALITY OF SÃO LOURENÇO DA MATA

Water and Sanitation
2014
Pernambuco, Brazil
Compesa

The assignment corresponded to a structural action projected to absorb the demographic growth of the city for the next 20 years, allowing the increase of the total flow to 500 litres per second.

Services:

Implementation of the water supply system in São Lourenço da Mata.

Project

MACRO DRAINAGE AND STABILISATION OF MORRO DO TCHIZO PROJECT – PHASE 1, IN THE PROVINCE OF CABINDA

Water
2017/2018
Cabinda, Angola
China Energy Engineering Group Guangxi Hydroelectric Construction Bureau Co. Ltd

Degraded area treatment (ravine), with a mixture of earthwork solutions consisting of slopes and benches, surface water treatment and drainage.

Services:

Topographic study; Integrated urbanistic project; Geometric project; Design of earthworks, pavement, micro-drainage, macro-drainage, signalling and safety, and public lighting.

Project

CONSTRUCTION OF NEW WATER SUPPLY SYSTEMS IN THE MUNICIPALITIES OF ECUNHA, CHITEMBO, CACULA, JAMBA, CANGANDALA AND QUELA

Water and Sanitation
2016/2017
Angola
CHINA NATIONAL COMPLETE ENGINEERING CORPORATION

Detailed design developed in the scope of the Government project, implemented by the Direcção Nacional de Águas (DNA) "Water for all" programme, with a view to speed up the supply of drinking water to the populations of the town' s centres.

Services:

Geotechnical study; Architectural design; Earthworks design; Hydraulic design; Structural design; Electricity and automation design; Design of building equipment; Drainage design.

Project

CONTROL OF 77 RAVINES IN THE PROVINCES OF CUANDO CUBANGO, HUAMBO, UÍGE, MALANJE, BIÉ, LUNDA SUL, LUNDA NORTE AND MOXICO

Water
2018
Angola
DNOE - Direcção Nacional do Orçamento de Estado

Detailed Design for the recovery of 77 ravines in 10 provinces of Angola. The disorderly occupation of spaces together with the geological characteristics of Angolan soils result in serious ravine processes, which often risk buildings and infrastructure, as roads and railways.

Services:

The scope of the project covers geotechnical, topographical, and hydrological studies; slope stability calculation, geometry projects, earthworks, drainage, and environmental protection

Cristina Reis

Director of the Water, Sanitation and Waste Business Unit and the Sustainability and Energy Business Unit

Directors

${ selected }
  • FUTURE ATP
  • FUTURE BDM
  • FUTURE Proman

Renato Rosolen

Business Development Director at FUTURE ATP

Andressa Melo

Transportation Infrastructures Business Unit and Water, Sanitation and Waste Business Unit Director

Cristina Reis

Director of the Water, Sanitation and Waste Business Unit and the Sustainability and Energy Business Unit