Decades of experience in this sector, in different geographies and contexts, allow us to provide our clients with reliable, consistent and optimized management models for the implementation of their projects.
The main objective of the Construction Management and Supervision Business Unit is to support its clients in the implementation of construction projects in a wide number of areas, whether public or private, ranging from major engineering and public infrastructure and transportation projects, to urbanization, buildings, industry, tourism, water and sanitation networks, environmental recovery, among others.
Through a strict Project Management practice, FUTURE Group is able to support its clients in the implementation of a set of methodologies that include processes, documents and rules, and which contribute to the successful management and execution of projects, with proper integration of stakeholders, resource optimization and risk minimization throughout the life cycle.
In construction supervision, FUTURE Group contributes to an adequate and rigorous control of cost, calendar and quality of the works. It is also common to associate to this service provision the onsite coordination of health and safety, as well as quality and environmental management of the works.
LOGISTICAL ROAD CORRIDOR ON DOUBLE TRACK BETWEEN THE VILLAGE OF SAN ANTÔNIO, SECTION II - EL QUEBRANCHAL SAN JUAN BRIDGE II AND SECTION III - SAN BRIDGE JUAN II, CITY OF GOASCORAN, IN LA PAZ AND VALLE
The "Dry Canal" is the largest road project in Honduras, which links the Pacific Cortes Port to the Atlantic Calvo Porto, forming a logistical freight corridor and generating transport savings between the two oceans and competing with the Panama Canal. 46 km road project, with implantation of double lanes, 16 bridges and a set of viaducts called “Intercambiador com la carretera CA-5”.EXTENSION OF THE PASSENGER TERMINAL, RUNWAY, AND CONSTRUCTION OF THE PARKING BUILDING OF GILBERTO FREYRE INTERNATIONAL AIRPORT IN RECIFE
Passenger Terminal and Runaway expansion works, as well as the construction of the Parking Building and Control Tower projects at the Gilberto Freyre International Airport in Recife/PE, Brazil.MAIN ENLARGEMENT OF PPP TAMOIOS
The SP-99 known as Rodovia dos Tamoios is the main road connection of the municipalities of the North Coast with the other regions of São Paulo, with emphasis on the Macro Paulista metropolis, with nearly 26 million inhabitants.PRAIA DA NICHA REHABILITATION (NEIGHBORHOOD RENOVATION, SHORELINE AND COASTAL PROTECTION WORKS)
The urban requalification on the shoreline of Praia da Nicha, in the province of Luanda, covers a coastal strip of approximately 1 300 m and 50 m wide of sand already grounded, including the construction, rehabilitation and maintenance of secondary and tertiary roads.CRUISE TERMINAL OF THE PORT OF LEIXÕES AND SEA POLE OF THE UNIVERSITY OF THE PORT
The Leixões Cruise Terminal has two main functional objectives: to increase port efficiency in the cruise ship segment and to expand Urban Integration with Matosinhos City.HYDROLIFT - LISNAVE SHIPYARD, MITRENA
Execution of maritime and terrestrial works performed in the Mitrena Naval Shipyard, in Sado River estuary - Setúbal, as part of the Lisnave Restructuring Plan, called "MITRENA 2000 PROJECT".LOGISTICAL ROAD CORRIDOR ON DOUBLE TRACK BETWEEN THE VILLAGE OF SAN ANTÔNIO, SECTION II - EL QUEBRANCHAL SAN JUAN BRIDGE II AND SECTION III - SAN BRIDGE JUAN II, CITY OF GOASCORAN, IN LA PAZ AND VALLE
The "Dry Canal" is the largest road project in Honduras, which links the Pacific Cortes Port to the Atlantic Calvo Porto, forming a logistical freight corridor and generating transport savings between the two oceans and competing with the Panama Canal. 46 km road project, with implantation of double lanes, 16 bridges and a set of viaducts called “Intercambiador com la carretera CA-5”.
Services:
Traffic studies, geometric design, earthworks, drainage, pavement dimensioning, road signalling, structure of bridges and viaducts, and supervision of the construction works, including environmental management.
EXTENSION OF THE PASSENGER TERMINAL, RUNWAY, AND CONSTRUCTION OF THE PARKING BUILDING OF GILBERTO FREYRE INTERNATIONAL AIRPORT IN RECIFE
Passenger Terminal and Runaway expansion works, as well as the construction of the Parking Building and Control Tower projects at the Gilberto Freyre International Airport in Recife/PE, Brazil.
Services:
Works monitoring, controlling the services performed and the fulfilment of the project, preparation of monthly measurement of the services performed, analysis of design revisions, when necessary, follow-up of the technological control.
MAIN ENLARGEMENT OF PPP TAMOIOS
The SP-99 known as Rodovia dos Tamoios is the main road connection of the municipalities of the North Coast with the other regions of São Paulo, with emphasis on the Macro Paulista metropolis, with nearly 26 million inhabitants.
Services:
Works Supervision.
PRAIA DA NICHA REHABILITATION (NEIGHBORHOOD RENOVATION, SHORELINE AND COASTAL PROTECTION WORKS)
The urban requalification on the shoreline of Praia da Nicha, in the province of Luanda, covers a coastal strip of approximately 1 300 m and 50 m wide of sand already grounded, including the construction, rehabilitation and maintenance of secondary and tertiary roads.
Services:
Works Supervision.
CRUISE TERMINAL OF THE PORT OF LEIXÕES AND SEA POLE OF THE UNIVERSITY OF THE PORT
The Leixões Cruise Terminal has two main functional objectives: to increase port efficiency in the cruise ship segment and to expand Urban Integration with Matosinhos City.
The building's construction area is 22 000 sq.m, the amount of concrete used was 23 000 m3, 3 700 tons of steel were used in reinforcement and 25 000m3 of earth were moved in the excavations.
Services:
Review of the Detailed Design; coordination and general supervision; planning and cost control; control of work quantities; quality control; safety coordination; technical-administrative control.
HYDROLIFT - LISNAVE SHIPYARD, MITRENA
Execution of maritime and terrestrial works performed in the Mitrena Naval Shipyard, in Sado River estuary - Setúbal, as part of the Lisnave Restructuring Plan, called "MITRENA 2000 PROJECT".
Services:
Design execution; Management, Coordination and Supervision of the various works contracts.